top of page

The Royal __ Technical Specification
-
Commercial, refurbishment
-
1950m2
-
Duration: 18 months
Construction Method
-
Under pinning
-
Basement excavation
-
Major structural alterations and support work
-
Replacement steel work
-
Replacement floors and walls
-
Steel frame extension
-
New roof construction
Location Challenges
-
Beach front location
-
No parking
-
No lay down areas
-
No material storage capacity
-
Major structural repairs due to previous neglect
Specification
-
Conversion of hotel to apartments
-
Basement apartments with under floor heating
-
Communal lift and panelling
-
Bin store and plant room
-
27 flats
-
Door entry system
-
New balconies and terraces
-
Restoration work to the front façade.
![]() | ![]() | ![]() | ![]() |
|---|---|---|---|
![]() |