top of page
IMG_9538.jpg

Funtington Development __ Technical Specification 

King and Drury purchased the site with planning but re-designed the scheme to accommodate well thought out, desirable homes that shared a countryside aesthetic. The completed development won the best mid-scale development award from the Sussex Heritage Awards 2019.  

Construction Method

  • Traditional strip foundations 

  • Traditional brick and block wall construction 

  • Steel frame barns

  • Oak frame detailing to windows and garage / carports

Location Challenges

  • The site is situated in the South Downs National Park

  • Access to the site was from a busy main road

  • Multiple protected trees and root protection zones 

Specification

  • FuelSmart fireplaces that heat the water 

  • Underfloor heating

  • Designer kitchens and bathrooms

  • Hardwood flooring

  • Bespoke staircases

  • Landscaped gardens and communal areas

Funtington Development Build
Funtington Development Build
Funtington Development build
Funtington Development Foundations and brick work

King and Drury Construction

Unit 3 West Barn, Old Dairy Lane, Norton, Chichester, West Sussex. PO20 3AF
Tel: 01243 839741 info@kinganddrury.com

Registered company number: 8348049

Privacy Policy

  • LinkedIn
  • Facebook
  • Instagram
  • YouTube
  • Houzz - Grey Circle
Sussex Heritage Award winner King and Drury
Business Alumni logo Goldman Sachs

copyright notice

bottom of page