Development, new build
180m2
Private Development
Duration: 9 months
Engineered ground beams
Brick and block walls
Steel frame to loft area
Cut roof
Poor ground
Original large septic tank removal
Tight access to site
Engineered hard wood floors
Designer bathroom suites
Lead dormer windows
Traditional Cedar cladding